How do you control the quality?Issuing time:2020-12-18 17:10 Before moulding, 3D drawing will be confirmed firstly. After moulding, samples will be provided for approval. The mass production will be launched based on approved samples. Doing 100% inspection during production and radom inspection before packing. |